The event was held under the auspices of the Centre of passive house , the main author of the design documentation is the company H.L.C. s.r.o. and the main construction material is the NOVATOP system.

Friday, April 20, 2012. We are starting to build the passive house

We are putting together the bearing structure of the mobile passive house directly at the premises of Brno Exhibition Centre. Construction material used: floor – NOVATOP ELEMENTS with insulation, walls – panels NOVATOP SOLID of the thickness of 84mm, roof – elements NOVATOP OPEN.

Tuesday, April 24, 2012. We are placing the windows and installing the distribution system

We are insulating the side walls, placing the windows, putting the front wall of the house and installing the air conditioning and the electrical system.

Wednesday, April 25, 2012. Everything goes according to the schedule of the construction

We are insulating with blown cellulose, fibreboards, glass and mineral wool and installing outside blinds. We are building example walls from cellular concrete blocks and brick blocks.

Thursday, April 26, 2012. The construction crew is assembling the roof.

We are assembling the structure of the roof cladding and putting there heat insulation, placing trapezoidal sheets, cladding the facade with larch boards and working on the preparation of the bathroom. We are building the example walls from the system of permanent shuttering and from wooden structures

Friday, April 27, 2012. We are finishing the passive house!

We are finishing the cladding of the passive house with larch boards, we applied contact plaster on the back wall, we are carrying out the surface finish in the bathroom, putting together the kitchen unit and the lights, assembling the intelligent wiring and the house is being furnished with stylish furniture.

Saturday, April 28, 2012. The unique construction reality show is drawing to an end!

The mobile passive house was built at the Brno Exhibition Centre in front of the visitors in incredible four days. On the last day, the house was ready for visiting.

… and where is the mobile passive house located now?

In the National Building Centre EDEN in Brno.

… and what will happen next?

The house will be auctioned in the autumn fair called ForArch .The auction begins at symbolical 1 CZK.

 